A deferred project leaves material that was purchased against a schedule and is now against nothing. It is usually new, usually crated, and usually accompanied by full certification, which makes it the strongest category of surplus there is.
The problem is that it is also the most awkward to dispose of, because the paperwork trail points at a project that has been cancelled and nobody wants to sign the disposal.
The practical sequence
What happens, in order
What we need
The short version
A rough list, a location and a date. That is enough to start. If there are photographs, the review is faster and the number is more confident.
We do not need the valves cleaned, sorted or labelled. We do not need a data sheet for each item. And we do not need you to decide which items are worth selling before you send the list — that is the review.
Mixed lots and partial assemblies are included. If the material is awkward, unidentified or incomplete, say so and include it. A lot that describes its own problems is faster to price than one that does not.
Questions sellers ask
Do you buy new crated valves?
Yes, and this is the strongest category we handle.
Are certificates important?
They are most of the value in this category.
Can you buy a partial project package?
Yes, by line item or as a whole.